Poultry Processing Plant

PROJECT: Poultry Processing Plant Electrical. Instrumentation
Installation Services. Phase-l & 2

CLIENT / END USER: Sabirs’ Poultry

MAIN CONTRACTOR: Electroways Pvt. Ltd

YEAR: 2013-2014 & 2016

BRIEF DESCRIPTION:Complete. E& I installation and commissioning services ofall field work
4.9 MW Load.

AREA OF INTRESTS:

  1. ll KV H.T. Metered Panel for WAPDA Sub Station installation
  2. TRANSFORMER installation
  3. Bus Tie Duct (BTD)
  4. lIKVA – XLPE cable pulling and termination
  5. LT MAIN PANEL BOARD –
  6. Incoming and buss coupler panels
  7. Generator Panels
  8. Power Factor Panels
  9. Lighting Distribution Boards
  10. PLC & Control Panels
  11. LCable Tray and Conduit Supply and Installation
  12. Power & Control Cabling & Termination
  13. lnstrument Installation. testing & commissioning assistance
  14. Fire Alarm System Installation, testing & commissioning